CEJ Geotech

CEJ GeotechCEJ GeotechCEJ Geotech
Home
Survey Spares
Projects
Our Team
Contact
Gallery
Surveyspares.com
Blue Robotics
Knipex

CEJ Geotech

CEJ GeotechCEJ GeotechCEJ Geotech
Home
Survey Spares
Projects
Our Team
Contact
Gallery
Surveyspares.com
Blue Robotics
Knipex
More
  • Home
  • Survey Spares
  • Projects
  • Our Team
  • Contact
  • Gallery
  • Surveyspares.com
  • Blue Robotics
  • Knipex
  • Home
  • Survey Spares
  • Projects
  • Our Team
  • Contact
  • Gallery
  • Surveyspares.com
  • Blue Robotics
  • Knipex

- Polar Projects -

From Svalbard in the North to the Falklands in the South.

Det‐Norske, Svalbard Barents Sea- 2015

  

Party Chief on Geochemical Sampling and Analysis Campaign on board RV Neptune, situated south of Svalbard. Project involved Gravity corer, MBES logged using a Reson 7125 and 8160, navigation from Eiva, corrections from C‐Nav 2050, SBP from SES topside with InfoX acquisition software, Position provided by GAPS USBL, Geosuites for MBES processing. Samples collected were AGI, APT and MPOG for hydrocarbon analysis, we also took Slick sampling on area being prospected for Macroseep locations. High demand from HSE and project management by Det‐ Norske, liaising closely with the client representative

Premier Oil, Falkland Islands 2014

Party Chief for Geotechnical/Geochemical survey, Offshore Falklands for oil prospecting, managing all aspects of the project from mobilisation to completion and demobilisation. Including obtaining Strata samples and data for Geochemical and Environmental as well as Hydrocarbons. Also required to deploy Wave Buoy for and on behalf of Gardline for long‐term Wave height analysis

Noble Energy, Falkland Islands 2014

  

Party Chief for Geotechnical/Geochemical survey, Offshore Falklands for oil prospecting, managing all aspects of the project to completion and demobilisation. Including obtaining Strata samples and data for Geochemical and Environmental including Hydrocarbons

ENI / Repsol, Tromso Norway 2013

200m ‐ 300m deep Geotechnical and Environmental survey, offshore Norway (Arctic Circle 72° North), conducted on MV Neptune. Senior engineer and Deck supervisor responsible for all deck operations and assist party chief in preparation to undertake my first Party Chief role

Copyright © 2021 CEJ Geotech - All Rights Reserved.

  • Surveyspares.com

Powered by GoDaddy